Saturday, January 22, 2011

Built in Wall Unit Part IV - Woodwork Complete

I know its been almost two months since I've last posted. In what spare time and vacation I've had I spent almost all of it in the garage working on this project. I wanted to post some completion pictures so I'm not going into detail on the construction.

We built it out in 3 phases:

1) Right most unit with 12 little drawers
2) Base Cabinet
3) 3 Upper shelving units.

The client already has the first unit so I can't show what it all looks like standing next to each other yet. She is going to finish the cabinets then I need to go over and fit and install them.

Finished Right Cabinet:


Finished Right Cabinet next to Base Cabinet



Finished Base Cabinet and shelving units:

Roughly what the stain glass doors in the middle shelving unit will look like assembled (the outer edges of the doors have since been rounded over with 3/16" roundover bit):


That's it for now.. hopefully I'll have more time to walk through some of the actual building process.