Between working a ton of overtime and entertaining my parents for a week and finally trying to recover from a case of bronchitis, I haven't had a chance to post a picture of the completed bed. The following picture is the bed as we set it up in my daughter's room a week and a half ago. I was in a bit of a rush trying to get it together and ready as it was already getting fairly late in the evening so unfortunately I didn't get any pictures of the assembly of the angle iron onto the rails or any of the setup. Just one shot before we tossed on the mattress. You can see all the poplar slats, they are spaced about a 1/2" apart. The bed is rock solid. The mattress comes up just even with the bottom of the headboard. My wife is still working on the quilt, perhaps when she gets that done I'll take a picture of the bed with it and post it.
Saturday, June 5, 2010
Sunday, May 23, 2010
Pencil Post Bed - Final Pieces
With the finish applied to the bed, it's time to take care of those last few pieces to complete the bed. Chandra picked up two pieces of 1" angle iron for me from a welding shop in Charlottesville on Friday that screw into the side rails and hold the slats that go across the bed under the mattress. On Saturday morning I picked up some poplar boards from Northland Forest Products in Troy to make the slats for under the mattress. On Saturday aft, we drove into Charlottesville and bought a mattress for the bed. The remainder of Saturday saw me cutting the 4 poplar boards into 20 slats (4 slats I derived from other poplar boards I had on hand).
I used a 3/16" round over bit on all edges of the slats so that there was nothing to catch on the mattress. Wrapped that up around 11:15pm on Saturday night.
I had to drill the screw holes into the angle iron - 12" on center and countersink for woodscrew heads. Chandra was a bit worried or upset. Having never bought steel before she was a little concerned over the surface rust and scale on the material but I assured her that it would clean up fine. To make sure I used 50gt sanding disks on my 4-1/2" angle grinder and cleaned up all the rust and scale and rounded over any sharp corners. We hung em from the garage door track again and gave them a coat of primer - grey Rustoleom and two coats of black paint. I had to space things out a little longer today because the weather would be sunshine one minute and thunderstorm the next. So the humidity was high and the paint/primer was a little slower drying. I needed it done today to give it a good 48hrs of dry time before we had to assemble the bed.
If I understand correctly my dad and step mother will be arriving sometime on Wednesday. I think I can confidently say that they will now have a bed to sleep on. However, my wife is furiously trying to finish up the quilt for the bed. So while they have a bed to sleep on, they might have to wait a few days for the coverings.
I'll post a picture of the bed setup sometime later this week if all goes well.
Friday, May 21, 2010
Pencil Post Bed - Applying the finish
Over the past week and a half, whenever I could slip a few minutes in at night or on the weekend I've begun to close in on the finished bed.
Last weekend I spent a pile of time sanding and adding the profile to the rails. On Monday night we cleaned the garage and hung most of the big pieces by string from one of the garage door rails and began to apply the finish.
Having read a recent article in Fine Woodworking on preventing cherry from getting a blotchy finish - Blotch-Free Cherry I decided to follow one of the suggested courses:
1) Apply a wash coat of diluted shellac - 50% dilution of Zinser Sealer Coat - Wax Free Shellac using 2/3 cup denatured alcohol to 1 cup shellac. See formulas: Mixing Shellac. Though I've never seen it printed on the can, it seems common knowledge that the Zinser shellac's are 2lb cuts so the diluted wash coat is therefore a 1lb cut.
2) Watco Danish Oil - Cherry colored.
We applied the washcoat of shellac on Monday night after cleaning the garage and hanging as much as we could from the garage door tracks.
We then rehung everything and applied the Danish oil using extremely liberal amounts. Below is a picture of the headboard completely saturated with Danish oil. Due to the washcoat, the Danish oil largley floated on top.
We followed the directions on the can: apply first coat liberally, wait 30min, apply second coat, wait 15min and wipe off access using lint free "t-shirt" material cotton painter's rags. It was amazing how much rubbed off. The bulk of the red coloring wiped right off but enough stayed behind to give a pleasing brown hue with a slight tint of red. I had to keep going out to the garage every hour or so for the first few hours post application in order to wipe everthing down one more time to ensure that any oil that seeped out of the pores of the wood was removed.
I'm currently torn as to whether to apply a coat of poly or paste wax or just leave as is. I've a ton of programming to do at work this weekend, plus I need to drill the angle iron for the side rails, cut and plane the poplar for the slats and buy a mattress. All before Tuesday. The finish feels smooth as a glass right now and its been curing this Tuesday night. We'll see if we apply the poly or not.
Sunday, May 9, 2010
Pencil Post Bed - Getting closer
This weekend was a productive weekend in terms of making some progress on the pencil post bed. I managed to put in the 1/4" filler at the bottom of the rail mortises to fix the little mistake I made last weekend. I glued them up on Friday night and then on Saturday I trimmed down the excess with a small handplane and sanded them flush. I spent an hour or so paring the spacer down to get a good fit on the rail tenons. With the mortises properly fitted to the tenons on the rails, I did one last check of the rails and verifed the inner and top faces and marked them accordinly.
I then proceeded to drill and counter bore the bed bolt holes in each of the posts. I laid out the holes taking careful consideration that the difference in thickness of the rails. Using the drill press and the fence on the drill press to make sure that I was accurately centered for each hole, I drilled the larger 1" hole, 7/8" deep and then bored through at 7/16" diameter. The larger hole is for the bed bolt head and the smaller for the 3/8" bolt to slide through. The holes had to be offset so that the bed bolts don't intersect. The holes for the head and foot rails are the same distance down from the top of the rails (1-1/8") as the holes for the side rails are up from the bottom rails.
With the holes drilled in the posts, I bored the hole into the inside of each rail where the bed bolt nut will sit using the drill press using the same 1-1/8" spacing either from the top or the bottom of the rail depending on which rail I was drilling. These holes are 3" back from the end of the rail (excluding the tenon). These are not through holes, so I used the depth stop on the drill press to prevent going any further then neccessary. I then placed the rail on the top of my worktable and tenon into the post mortise. Then using the hole previously drilled into the post as a guide hole I strarted drilling the 7/16" hole through the end of the rail. I had to finish drilling the hole by without the post as the depth of the hole was pretty much the maximum drill length of the drill bit after the post was removed.
Wi all the holes drilled and tested we moved the parts outside onto the driveway and did our first full assembly with the bed bolts. Mattheus gave me a hand assembling and Shae-Lynn acted as crew foreman. With the bed out of the way and assembled in the driveway I could verify the measurements for the tester frame (the frame that goes around the top of the bed).
After cutting and planing the frame rails and using the dado blade I cut the half lap joints into the ends of both the long rails and the short rails. I cut the dados into the long rails for the two short center rails. Unfortunately it was getting late so we moved the bed into the garage and re-assembled around my work table. The final frame is shown below.
There is one final piece of woodworking to do before sanding and finishing the bed. I need to cut the profile on the outside of the top of each rail. I still need to purchase the 2 angle iron pieces to go along the inside of the side rails and then cut and plane the poplar cross boards that the mattress sits on. I figure those boards can be created after the rest of the bed is finished unless time presents itself. I'd rather get the finish on the bed before I turn to those pieces since they don't require finishing and can probably be done in an evening or two - I think there is about 20 of them to make.
Saturday, May 1, 2010
Pencil Post Bed - Fitting Rails and Cutting Headboard
I finally got a chance to get back at the pencil post bed that I'm making for my daughter. The pressure is on, I have 25 days to get the bed complete, however, I also have a massive deadline at work. If I don't make significant progress today and hopefully finish off the woodworking next weekend I'm in big trouble. The day saw great progress on a number of fronts and a two minor errors on my part because I was rushing myself. One is a fixable mistake and the other is one where if you didn't know it wasn't supposed to be that way, you wouldn't know it existed.
I started the work last night actually, by laying out the mortises on the posts and doing basic prep work for today. The day started by cutting the mortises in the posts beginning with the 8 rail mortises - 3/4" wide, 3/4" deep by 3-1/2" long. That was the first mistake - the 3-1/2" long. It was what was called for on the drawing but I had completely forgotten that I had to make a minor compromise when sizing the rails and wound up with rails that were 3-1/4" high - not the 3-1/2" that were called for in the plans. It is a fixable error, I'll need to glue in a 1/4" piece into the lower end of each mortise slot, this won't be visible in the finished bed since it will be hidden by the rails themselves being 2-1/4" wide. Depending on how well I match the wood, they may not be noticeable at all. I'm still kicking myself in the butt for it but alas not much that I can do now.
Cutting the mortises in 2 passes using the 3/8" chisel, flipping the post end for end to make sure that the mortise wound up dead center.
Cutting the long mortise for the headboard required using double stick tape to put the cut-offs from the tapers back onto the tapered section of the pencil post bed to allow me to cut the mortises along the center line of the post. It took a bit of time to get all 3 sides taped onto each post. Three sides because I needed the bottom to be flat so that the post didn't tip while cutting the mortise and two sides so that I could flip the post around and cut the mortises in two passes just like I did for the rail mortises above. If you look closely you will see the tapered cut-offs on the sides of the taper at the bottom of the picture.
Mortises are complete both rail and headboard mortises. After cutting them, I cleaned up to the final width using a chisel and in the case of the headboard mortise I carefully sanded the long slot on the inside to make sure that the headboard would slide in. It is still a bit tight, I will need to loosen things up just a touch before I do any final finishing and assembly.
With the mortises complete and the headboard mortises in place I decided to cut the headboard and route it to final shape. I used the bandsaw to cut the rough shape and since the curves were not very tight, I went ahead and used the 1/2" blade that I had in the saw. It worked but I should have used a 1/4" blade instead. I'm running a bit short on 93-1/2" blades as most of my new blades are 105" as I have a riser block to put into the bandsaw. I'm waiting until I either have a need for the riser block or I've exhausted my supply of 93-1/2" blades before switching. That way I don't have a bunch of blades laying around that I can't use after I put in the riser block.
Johannes helped support the board when it hung way off the edge of the table and Chandra made sure she recorded it all with the camera. I didn't take time to take a photo while routing the final shape. I used the template I had made out of 1/4" plywood and used a pattern bit to cut the final shape. The end result was a very smooth cut with almost no sanding required. I still have to sharpen the point on the dip in the center of the profile but that is about it. With the head board completed, we took the time to assemble it onto the posts and show Shae-Lynn what the headboard will eventually look like. I think the bed might be a tad big for such a small girl.
It also appears that I may need to create a matching piece for on top of the profile so that the bed can server dual purpose - head board and stocks when Shae misbehaves. Though I'm thinking I don't really want to have anyone throwing rotten eggs or tomatoes in the house. So alas she may get a reprieve - but when she decided to pose like this it certainly ran through my wife's head - she said it (not me).
Finally after supper, we cut the rails to length and cut the tenons onto each end using the dado blade, sacrifical fence and a long support on the miter guage. In the rush to finish up, this is where I made my 2nd big mistake. I knew the tenon needed to be 3/4" wide and I knew I put the mortise dead center and for some reason I made the assumption the tenon would be dead center. But alas it was actually supposed to be 1/8" off center. 5/8" to the front of the rail and 7/8" to the back of the rail. This would have given a 1/4" reveal on the front of the posts where the rails met the post and would have made the rails flush with the inside of the post. Now there is a 1/8" reveal on the front and a 1/8" reveal at the back. Not the end of the world and if I didn't write it here, most people would never know it was supposed to be off centered. Functionally it won't make a big difference if any.
I had to fit the rails to the posts using my Lie Nelson medium shoulder plane - the most expensive hand tool I own but it does a really nice job. I use it more than any of the other planes I have.
We finally got it all together for the first visual of what the bed will eventually look like.
We don't have the bed bolts in yet, its simply held together by friction and the two really long pipe clamps I bought when I was building the couch. We decided to leave it up over night so that Shae can see what the bed will look like.
Next weekend I have to drill the bed bolt holes, then refine the fit just a bit. Everything needs to fit a little looser in order to make it possible to assemble and disassemble the bed in the future. I need to build the tester frame for around the top and put in the dowels on the tops of the posts. Need to cut the 20 or so slats I need for under the mattress and I need to find some 1"x1" x 80" angle iron to hold the slats. And of course put the 1/4" spacer in the bottom of the mortises I cut too long. Then lots of sanding, scraping and prep work and then finishing it.
It is going to be a huge challenge to get it all done in the next 25 days. I have a ton of work to do at work that will require me working a lot of overtime over the next few weeks. Time will be tight but at least now that we've made it this far, there is at least a hope that it can be completed.
Friday, April 23, 2010
New Toys
It has been a couple of weeks since my last post in that time frame I've had to run all new electrical circuits in my garage to handle some of my new toys.
It all started the week before Easter. I got my bonus from work which finally allowed me to get a new tablesaw and dust collector that I'd been dreaming of for over a year. I had already picked out a the tablesaw and dust collector - both from Grizzly Industrial Inc. I didn't want to buy without seeing and if I drove down I might as well buy the stuff and bring it home. After considering several options we finally did the math and realized that if we were to buy a trailer hitch and drive down with a U-Haul trailer we would be able to make the trip and bring home the equipment. I bought a hitch from etrailer.com and put it on the mini-van. We managed to drive up on Friday evening and back on Saturday evening.
Both the new tablesaw and the dust collector both required 220v circuits of which I had none in the garage. So two weeks ago I pulled an electrical permit and proceeded to install 2 new 20amp 220v circuits with 2 outlets on each circuit. The tablesaw draws about 12.8amps and the dust collector about 12 amps. The jointer that I bought last summer (old Craftsman from the 1960's) was originally 220v but I changed it to 110v so I figured that I'll eventually convert it back to 220v. Eventually I'd like to put a 1.5 hp motor on my bandsaw (currently 3/4hp) and run it on 220v as well. Yesterday the new circuits were inspected and passed by the electrical inspector making it possible to actually use my new toys.
I've been extremely busy at work the last few weeks, so putting in the circuits and putting together new equipment has dragged on over about 3 weeks. I still have some work to do on some upgrades I purchased for my bandsaw, but I got the dust collector and tablesaw functional.
Earlier this spring we attended "The Woodworking Show" in Fredericksburg, VA and a couple of weeks ago we went to the same show in Chantilly, VA. Normally I wouldn't have attended both shows but I needed to exchange the Carter bandsaw blade conversion kit that I bought at the Fredericksburg show with the one that could be used with a riser block that I bought a few weeks later. We also bought the Kreg fence for the bandsaw after a year of using a home made fence that was clamped to the table and constantly coming loose.
Tomorrow I hope to make some progress on Shae's bed for a few hours. I really need to kick that project into high gear. I also need to spend the better part of the day and probably all day on Sunday at work as well. I have a major deadline rapidly approaching and a ton of work to do.
Thursday, April 8, 2010
Making a Sign Blank
A friend of mine paints and makes vinyl decals for signs. He had a project that required making a sign out of some form of polyurethane or foam board. The material was about 1-1/2" thick. He had drawn the outline of sign but didn't have the equipment to cut out the shape he wanted so he asked me to cut it out for him. My main concern was that I wanted to make sure the sign was perfectly uniform - a mirror image from side to side but I didn't really want to use a quarter sheet of plywood on making a single template. Instead I made two templates - one with half the top pattern on it and the other with the entire side.
I got a bit ahead of myself in that I cut the rough shape following the outline using my jigsaw before I created the templaes. When I laid out the templates on the outline I realized that the original outline sketch was not a perfect match side to side. It was close enough that in the end I managed to get the completed blank cut with mirror images side to side while staying within a 1/32" from his original sketch lines at the points where the lines came closest to the template. Lesson learned, always create the templates and validate the layout side to side before cutting. Using the templates I cleaned up the shape using a 2" edge trim bit in my router. The material cut very easily though it left a sand like residue on everything. I finished off the sign blank using a 1/4" round over bit to ease the edges. My friend requested this as apparently the paint won't stick as well to sharp edges.
The photos below shows the finished sign blank - I even splurged, I hired a super model to hold the sign while I took the picture. I don't think the super model was impressed with the gig though, but she at least smiled for the second photo. From start to finish it probably took about 3hrs. The bulk was in drawing the shapes onto the templates and then cutting and refining the templates so they had smooth curves. I'm pretty pleased with the way the sign blank came, it really looks good.
The photos below shows the finished sign blank - I even splurged, I hired a super model to hold the sign while I took the picture. I don't think the super model was impressed with the gig though, but she at least smiled for the second photo. From start to finish it probably took about 3hrs. The bulk was in drawing the shapes onto the templates and then cutting and refining the templates so they had smooth curves. I'm pretty pleased with the way the sign blank came, it really looks good.
Subscribe to: